Absolute ABS-1500 Installation And Operating Manual page 65

Gas-fired condensing hot water boiler
Table of Contents

Advertisement

a.
Local operation via internal set point, The output of the boiler modulates on the basis of the flow temperature.
b.
Remote operation via external signal (4-20mA) for output or temperature set-point
c.
Lead/Lag (Cascade master control) communicates directly to each boiler via Modbus communication protocol.
Important!! – No frost protection when the boiler power is turned off
6.
Air pressure switch calibration and check
a.
Check sensing tube, connected no cracks or splits
b.
Command boiler on, disconnect sensing tube from switch our air shroud
c.
Boiler shall shutdown on air pressure switch open
d.
Reattach sensing line and restart boiler and confirm correct operation
7.
Low gas pressure calibration and check (manual reset)
a.
Check for leaks around the surface mount of low gas pressure switch for gas leaks
b.
Command boiler on, while starting turn dial to the maximum setting or until boiler shutdown on LCI (operating
interlocks), the switch is equipped with a LED indication when switch has activated.
c.
Set switch setting back to 3.5" w.c., press the reset on switch and observe boiler shall start again automatically.
d.
Confirm pressure via inlet test point of the gas valve (3), measure the pressure while operating in high
fire position to confirm sufficient gas pressure if available, inlet gas pressure lower than 3 ½ inch w.c. will
result in poor air/fuel ratio and reduce output. The gas pressure shall always be above the 3.5 inch w.c. at
all times. The switch will activate in low gas supply pressure conditions and shall not be circumvented.
Absolute Boilers ABS 1500-2000-2500-3000-4000
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

Abs-2500Abs-4000Abs-3000Abs-2000

Table of Contents