Narrow Duct Attachment - Option 1; Narrow Duct Attachment - Option 2 - Nordyne M4RC54D-24B Installation Instructions Manual

Single stage condensing gas furnaces m4rc series; m4rl series
Table of Contents

Advertisement

4. Install the duct connector back in the floor opening with
the bottom tabs extending into the supply air duct.
5. Install the mounting plate
side of the duct connector. Align the screw holes in both
components.
6. Secure the duct connector and the mounting plate to
the wood floor with appropriate size screws.
7. Secure the duct connector and the mounting plate to
the wood floor with appropriate size screws.
8. Install 2 plates
(Figure
15) on top of the duct connector,
one on each side (left and right) of the opening. Align
the screw holes in both components.
9. Secure both plates and duct connector to the wood
floor with appropriate size screws.
10. Bend the connector tabs on the bottom of the duct
connector upwards and as tight as possible against
the supply air duct.
11. Bend both tabs on the mounting plate
90°.
12. Seal all connections with industrial grade sealing tape
or liquid sealant. NOTE: Requirements for sealing
ductwork vary from region to region. Consult with local
codes for requirements specific to your area.

Narrow Duct Attachment - Option 1

Thes alternate attachment methods may be used to install
a furnace duct connector to narrow metal ductwork if
insufficient clearances prevent the bending of the duct
connector tabs at the side of the duct.
1. Select Option A or Option B in
top of the supply air duct. Remove metal flaps from the
duct (shaded area) if Option A is selected.
2. Fold the duct flaps up to form an opening for the duct
connector (applies to Options A or B).
3. Install the duct connector with the bottom tabs extending
into the supply air duct.
4. Bend the tabs on the bottom of the duct connector
upwards and as tight as possible against the removed
ends of the supply air duct.
5. Form the duct flaps up against the side of the duct
connector as tight as possible. See
Figure 14
Hole for
Gas Line
Duct
Connector
Figure 14. Duct Connector Installed
(Figure
14) under the back
(Figure
14) up
Figure 16
and cut the
Figure 16
Bend tabs
up 90°
Mounting Plate
Duct Connector
Supply
Bend tabs tightly
Air Duct
against supply air duct
Figure 15
Figure 15. Duct Connector Side Plates
6. Secure the duct connector flaps to the supply air duct
with staples (3 minimum) or if a 2x block/joist is not
provided, use sheet metal screws (2 minimum).
NOTE: The duct connector tabs may be attached to
the air duct with sheet metal screws or other suitable
fasteners as long as the duct connector and the air duct
are securely attached.
7. Seal all connections with industrial grade sealing tape
or liquid sealant.
NOTE: Requirements for sealing ductwork vary
from region to region. Consult with local codes for
requirements specific to your area.

Narrow Duct Attachment - Option 2

The alternate attachment methods listed below may be
used to install a furnace duct connector to narrow metal
ductwork if insufficient clearances prevent the bending of
the duct connector tabs at the side of the duct.
1. Cut and remove the top of the supply air duct as shown
in
Figure
16.
2. Install the duct connector with the bottom tabs extending
into the supply air duct.
3. Bend the tabs on the bottom of the duct connector
upwards and as tight as possible against the supply
air duct. See
Figure 17 (page
4. Secure the duct connector tabs to the supply air duct
with staples (3 minimum) or sheet metal screws (2
minimum).
Figure 16
Fold duct flap here
Cutting
Option A
Fold duct flap here
Fold Flap Here
Cut Here
Cutting
Option B
Fold Flap Here
Figure 16. Narrow Air Ducts - Option 1
18).
Finger Tabs
Supply
Air Duct
Narrow
Fold duct flaps
Duct
into duct
connector
Secure Flaps with Staples
or sheet metal screws
Supply
Air Duct
Narrow
Duct
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

M4rc072d-35cM4rc108d-45dM4rl090-35cM4rc090d-35c

Table of Contents