Shutdown and Cleaning
Optional Cleanup:
•
Perform Pressure Relief Procedure, page 10.
•
Empty the paint hopper, see page 12.
•
Disconnect motor plug (N) and remove material
dispenser (E) from height adjustment mount.
ti21484a
•
Remove paint hopper (S) from field marker.
16
N
E
ti21485a
S
ti21363a
•
Clean out paint hopper at a sink.
•
Install paint hopper onto field marker.
•
Install material dispenser (E) and connect motor
plug (N).
E
ti21487a
•
Perform Flushing Field Marker procedure steps 5 -
15, page 15.
N
ti21483a
332119E