Download Print this page

Installation - Fisher-Price DMK17 Instructions Manual

Projection mobile by jonathan adler

Advertisement

1,5V x 4
C (LR14)
Soother
Soother
• Loosen the screws in the battery compartment door and remove the door.
• Insert four C (LR14) alkaline batteries.
• Replace the battery compartment door and tighten the screws.
• If the soother begins to operate erratically, you may need to reset the electronics.
Remove the batteries and reinstall.
IMPORTANT! Under normal use conditions, the batteries in the soother will require
replacement more often than the batteries in the remote.
• When sounds/lights/projection from the soother become faint or stop, it's time for an
adult to change the batteries.
Remote
• Loosen the screw in the battery compartment door and remove the door.
• Insert two AAA (LR03) alkaline batteries.
• Replace the battery compartment door and tighten the screw.
• If remote control begins to operate erratically, you may need to reset the electronics.
Remove the batteries and reinstall.
Battery Safety Information
In exceptional circumstances, batteries may leak fluids that can cause a chemical burn
injury or ruin your product. To avoid battery leakage:
• Do not mix old and new batteries or batteries of different types: alkaline, standard
(carbon-zinc) or rechargeable (nickel-cadmium).
• Insert batteries as indicated inside the battery compartment.
• Remove batteries during long periods of non-use. Always remove exhausted batteries
from the product. Dispose of batteries safely. Do not dispose of this product in a fire.
The batteries inside may explode or leak.
• Never short-circuit the battery terminals.
• Use only batteries of the same or equivalent type, as recommended.
• Do not charge non-rechargeable batteries.
• Remove rechargeable batteries from the product before charging.
• If removable, rechargeable batteries are used, they are only to be charged under
adult supervision.
BATTERY

INSTALLATION

For longer life, use alkaline batteries.
7
1,5V x 2
AAA (LR03)
Remote

Advertisement

loading