Pentair HBM 200 series Installation And Service Manual page 11

Submersible basin mixer
Table of Contents

Advertisement

appropriate ter mi nal blocks in
the control panel.
c. Before connecting power to
the control panel, make sure all
con trol switches (e.g. H-O-A
switch) and protective devices
(e.g. breakers) are in the Off
po si tion. Now connect power
to the terminal block or the
circuit break er as directed by
the sche mat ic.
d. Control
panel
grounded
properly
NEC and/or local codes. To
facilitate this, a ground lug is
provided on the control panel.
HBM (Pre December 2011)
Terminal Mixer Wire Color
M1
White
M2
Black
M3
Red
G
Green
1
Orange
Seal Leak Sensor
2
Blue
3
White w/Black Stripe Sensor Common Wire
HBM (Post December 2011)
Terminal Mixer Wire Color
T1
White
T2
Black
T3
Red
G
Green
S1
Orange
Seal Leak Sensor
H1
Blue
H2
White w/Black Stripe Sensor Common Wire
HBMX (Post December 2011)
Terminal Mixer Wire Color
T1
White
T2
Black
T3
Red
G
Green
S1
Red
Seal Leak Sensor
S2
Orange
Seal Leak Sensor
H1
Black
H2
White/Blue Tracer
must
be
per
Mixer Seal Leak and
Heat Sensor Terminals
Function
Mixer Power
Mixer Power
Mixer Power
Ground
Heat Sensor
Function
Mixer Power
Mixer Power
Mixer Power
Ground
Heat Sensor
Function
Mixer Power
Mixer Power
Mixer Power
Ground
Heat Sensor
Heat Sensor
HBM (Pre December 2011)
Mixer Motor
Power Terminals
HBM (Post December 2011)
HBMX (Post December 2011)
Incoming Power
Terminals
Ground
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hbmx 200 series

Table of Contents