System Inspection; Resetting - REMEHA HFS 600 Installation And Service Manual

Powerful domestic water boiler
Table of Contents

Advertisement

Commissioning
Pump primary circuit, speed-controlled
Three-way diverting valve
Pump secondary circuit, speed-controlled
Pump biomass boiler
Switching valve filling and draining
Drain pump / swimming pool pump
Filling pump for the boiler
Legionella prevention pump
6 .4

System inspection

Components on the roof:
All mounting screws tightened
All plumbing connections checked, no leaks
Solar energy station:
Correctly connected to the supply and return lines
Thermometer supply and return temperature placed and checked
Boiler:
Combination inlet group installed
Pressure reducer set at ........ bar
Hot water mixer with thermosiphon U connected to the solar boiler
Thermostatic mixer set to ..............°C
Insulation on the boiler checked
All connections lines installed
Expansion vessel:
Pre-charge pressure of the expansion vessel checked
6 .5

Resetting

.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
.....................................................................................................................................................................................................................................
Installation manuals (solar collector, boiler, complete station, controller) given to the customer
Operation of the solar energy system via the display on the control station explained to the customer
7651255 - v.01 - 23052016
Heat capacity
R1
Yes
No
∆ Ttarget
R2
Yes
No
Min. switching point
Collector temperature max.
R3
Yes
No
Self-calibration phase tu
R4
Yes
No
Minimum speed R1
Minimum speed R3
R5
Yes
No
Domestic water heating, desired values of the
R8
Yes
No
supplemental heating:
R9
Yes
No
R10
Yes
No
- Boiler circuit
6 Commissioning report
= .............. kW
= .............. K
= .............. °C
= .............. °C
= .............. min.
= .............. rpm
= .............. rpm
.............. °C
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
£ yes
yes
£
yes
£
HFS 650 / HSF 700
25