Download Print this page

TDS C-8515 Assembly Instructions

Power rack system

Advertisement

Quick Links

C-8515
POWER RACK SYSTEM
ASSEMBLY INSTRUCTIONS
DRAWING #1
CHINNING HANDLES - 1 RIGHT HAND, 1 LEFT HAND
UPPER SIDE CROSS BEAM (2)
PLATE (4)
(4)
UPPER FRONT
(3)
CROSS BEAM
UPPER REAR
(3)
CROSS BEAM
"J" HOOKS
1 RIGHT HAND
1 LEFT HAND
HELPER BARS
SAFETY BARS
NOT INCLUDED
1 RIGHT HAND
1 LEFT HAND
(2)
PLATE HOLDERS
1 RIGHT HAND
1 LEFT HAND
(2)
LOWER REAR
CROSS BEAM
(1)
UPRIGHT (4)
(2)
(1)
BASE (2)
(1)

Advertisement

loading

Summary of Contents for TDS C-8515

  • Page 1 C-8515 POWER RACK SYSTEM ASSEMBLY INSTRUCTIONS DRAWING #1 CHINNING HANDLES - 1 RIGHT HAND, 1 LEFT HAND UPPER SIDE CROSS BEAM (2) PLATE (4) UPPER FRONT CROSS BEAM UPPER REAR CROSS BEAM “J” HOOKS 1 RIGHT HAND 1 LEFT HAND...
  • Page 2 C-8515 POWER RACK SYSTEM DRAWING #2 REAR FRONT PLATE FRONT UPPER CROSS BEAM PLATE CHIN BARS REAR UPPER CROSS BEAM THIS UNIT IS BULKY AND VERY HEAVY. TWO PEOPLE ARE REQUIRED TO ASSEMBLE THIS UNIT. THIS UNIT REQUIRES (2) 3/4 WRENCHES FOR ASSEMBLY. DO NOT TIGHTEN HARDWARE UNTIL INSTRUCTED 1) PUSH (2) FEET ONTO (2) BASES.
  • Page 3 C-8515 POWER RACK SYSTEM PACKING LIST BOX #1 OF 2 PLATE (4) CHIN HANDLES “J” HOOKS (1) RIGHT HAND (1) LEFT HAND PLATE HOLDERS (1) RIGHT HAND (1) LEFT HAND UPPER REAR CROSS BEAM UPPER FRONT CROSS BEAM SAFETY BARS...
  • Page 4 C-8515 POWER RACK SYSTEM PACKING LIST BOX #2 OF 2 LOWER REAR UPPER SIDE UPRIGHT (4) BASES CROSS BEAM CROSS BEAMS...