F58G COMMERCIAL DUCT MOUNTED ELECTRONIC AIR CLEANER1

WIRING

WARNING
Electric Shock Hazard.
Can cause personal injury.
Be sure line voltage power source is the same as the
voltage and frequency listed on the air cleaner label.
• Assure all wiring complies with local codes and
ordinances.
• Wire the electronic air cleaner directly to the correct
voltage and frequency electrical source. See Fig. 6.
• Install extension box, with cover, for all external plugs and
wiring connections.
Power Connections:
1. Decide which end of the installed array is most accessi-
ble for wiring.
2. Cut off the plastic connector for each row of air cleaners
on the end selected.
4

OPERATION

Large particles (lint and hair) are caught in the pre-filter. As
the dirty air passes through the intense high-voltage electric
field surrounding the ionizer wires, all particles are given an
electrical charge. The air then moves through the collector
part of the cell where alternate parallel plates are charged
positively and negatively, creating a uniform electrostatic field.
The charged particles are attracted to and collect on the
plates that have the opposite electrical charge. The air leaving
the air cleaner has fewer particles. Each time the air circulates
through the F58, more particles are removed.
68-0233
P3
4
P4
P1 P2
J4
J5
5
J1
J1
1
ON/OFF SWITCH.
2
INTERLOCK SWITCH.
3
CONNECT TO MAIN POWER OR PLUG INTO ADJACENT UNIT.
4
LOW VOLTAGE CONNECTION TO BUILDING MANAGEMENT
SYSTEM OR PLUG INTO ADJACENT UNIT. 24V, 2A MAXIMUM.
5
STATUS INDICATION LED (TWO OR THREE).
Fig. 6. Internal schematic for F58G Electronic Air Cleaner.
3. Install a 2 in. x 4 in. extension box (for example, Steel
City part number 53171) to the end of each row of air
cleaners using the holes provided.
4. Connect power and ground leads to each row of air
cleaners.
5. Install cover (Steel City part number 52-C-1) on each
box.
6. Install box and cover over power connector on opposite
end of each row.
Connection to Building Management System:
1. Decide which end of the installed array is most acces-
sible for wiring.
2. Cut off the plastic connector for each row of air cleaners
on the end selected.
3. Install a 2 in. x 4 in. extension box to the end of each
row of air cleaners (Steel City part number 59361).
4. Connect each row in parallel to the building manage-
ment system.
5. Install cover on each box (Steel City part number
58-C-1).
BLACK
BLACK
RED
POWER
SUPPLY
2
BLACK
1
3

CHECKOUT

Inspecting Installation
Make sure:
• Sheet metal joints between air cleaner and duct are
sealed.
• All sheet metal connections are complete.
• Outside air, if used, is mixed with return air or heated, as
necessary, before it can reach the air cleaner.
• Airflow arrows on the electronic cell point downstream.
• Electronic cell and pre-filter are clean and dry.