4
x
Set-up and installation
Fig. 4-5
Hydraulic connection - legend see Tab. 4-2
(Example EKHHP500AA2V3 with
ternal heat generator)
1
Cold water connection
2
Hot water distribution network
3
Feed
Solar or for other heat source*
4
Return
Solar or for other heat source*
6
Circulation
7
Customer's side: Check valve, return valve
7a
Circulation brakes (2 in number) Recommended accessory
8a
Feed
Solar or for other heat source*
8b
Return
Solar or for other heat source*
9
Gas line (refrigerant)
10
Liquid line (refrigerant)
CW cold water
DHW
hot water
EKHHP
DAIKIN heat pump internal unit
EKSRPS4A
DAIKIN solar regulation and pump unit*
FLG FlowGuard - solar regulating valve with flow indicator*
ERWQ
DAIKIN Heat pump external unit
FLS FlowSensor - solar flow and feed temperature measurement
P
Boiler circulation pump*
K
P
Circulation pump*
Z
SK
Solar panel field*
SV
Customer's side: Safety over-pressure valve
W
External heat generator*
EX
*
Optional
Tab. 4-2 Legend for Fig. 4-5
● Carefully insulate pipe lines against heat loss and so as to
avoid the formation of condensation (insulation thickness at
least 20 mm).
Installation and operating instructions
12
● Connect the drain hose to the connector for the safety
overflow (Fig. 4-6 to Fig. 3-1, Item 23).
– Use transparent drain hose (draining water must be visi-
– Connect the drain hose to an adequately dimensioned
– Drain should not be lockable.
Fig. 4-6
Solar and optional ex-
4.4.1 Optional: Connection of an external heat
For support or as an alternative for heating by the heat pump you
can connect external heat generators (e.g. Solar, gas or oil boiler)
to the DAIKIN EKHHP.
The heat supplied by the external heat generator must be added
to the unpressurised storage tank water in the DAIKIN EKHHP
hot water storage tank.
● Carry out hydraulic connection in accordance with one of the
two following possibilities:
a) EKHHP(3/5)00AA2V3:
b) Only EKHHP500AA2V3:
– Fig. 3-1 and Tab. 3-1 give the position and dimensions of
– CArry out hydraulic system incorporation in accordance
– Design the lines as such that the sound attenuation cowl
ble).
waste water installation.
Installation of drain hose at safety overflow
generator
unpressurised via
connections (solar infeed and solar return) of the hot
water tank
or
pressurised solar heat exchanger.
the connections.
with Fig. 4-5.
Pay attention to the stipulated tightening torque (see
Section 4.1).
can be applied without any problem following assembly.
via the integrated
DAIKIN EKHHP(3/5)00AA2V3