Wiring Connections On A Powerscout Meter; Completing The Field Installation - DENT Instruments PowerScout 24 Operator's Manual

Power
Hide thumbs Also See for PowerScout 24:
Table of Contents

Advertisement

Wiring Connections on a PowerScout Meter

High voltage MAY BE PRESENT. Risk of electric shock. Life threatening voltages may be present.
Qualified personnel only.
Haute tension peut être présente. Risque de choc électrique. Tensions dangereuses peuvent
être présentes. Personnel qualifié uniquement.
PowerScout 24 meters have the following connections:
Either a three-wire connector for the RS-485 BACnet/Modbus link or an Ethernet connector.
Four voltage connections, but the leads are customer supplied.
PowerScout meters are self-powered from L1 and L2.
Up to twenty-four current transformers (CTs).
Digital output ports. The ports can be used to output kWh, kVARh, or kVAh pulses to external
devices, or to toggle on and off to control a remote device or relay.

Completing the Field Installation

Follow these steps to complete the field installation of your PowerScout meter:
Connect whatever communications cable you are using to the building network.
Connect your pulse output, if used. The port can be used to output kWh, kVARh, or kVAh pulses
to external devices, or to toggle on and off to control a remote device or relay. See Using the
Pulse Output Port Function.
Connect the CTs. See Wiring CTs.
Connect the voltage and power the meter. See Connecting Voltage.
Shop for Dent products online at:
37
PowerMeterStore
www.
1.877.766.5412
.com

Advertisement

Table of Contents
loading

Table of Contents