Download Print this page
Palram 700492 Assembly Instructions Manual
Palram 700492 Assembly Instructions Manual

Palram 700492 Assembly Instructions Manual

Lean-to greenhouse

Advertisement

Quick Links

A SSEMBL Y IN STRUCTIONS
LEAN-TO
Greenhouse
Overall Dimensions including base (Approx)
129L x 71W x 165H CM
I MP O R TAN T
You must read these instructions carefully before you start to assemble
this greenhouse. Please carry out the steps in the order set out in these
instructions.
Do not tighten the screws of the Greenhouse until completing on the
assembly of the panels.
Keep these instructions in a safe place for future reference.
SAFETY ADVICE
We strongly recommend the use of work gloves during assembly . Do not attempt
to assemble the greenhouse in windy or wet conditions.
Do not touch overhead power cables with the aluminum profiles. Always wear shoes
and safety goggles when working with extruded aluminum. Dispose of all plastic
bags safely - keep them out of reach of small children. The greenhouse must be
positioned and fixed on a flat level surface. Do not lean against or push the greenhouse
during construction. Keep children away from the assembly area. Do not position
your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
alcohol or if you are prone to dizzy spells. If using a step ladder or power tools ensure
that you follow the manufacturers safety advice. Hot items such as recently used grills,
blowtorches etc. must not be stored in the greenhouse. Ensure there are no hidden
pipes or cables in the ground before inserting the pegs.
GENERAL ADVICE
This is a multi-part assembly. Allow at least 180 minutes for assembly process.
Selecting a site - choose a sunny level position away from overhanging trees. If you
are fixing your greenhouse directly to a solid concrete foundation use the pre drilled
holes in the metal base supplied. The component parts should be checked and laid
out close at hand. Keep all small parts (screws etc.) in a bowl so they do not get lost.
Keep roof clear of snow and leaves.
CARE & MAINTENACE
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse
with cold clean water. DO NOT use acetone, abrasive cleaners or other special
detergents to clean the clear panels.
Replacement parts - contact Customers service helpline at:
For additional information please visit our web site: www.palram.com
TOOLS & EQUIPMENT
Tape measure
Work gloves
Crosshead screwdriver
Bradaw
Drill
2mm metal drill bit
Scissors
Step ladder
Spirit level
If help is required seek professional advice whithin store.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 700492 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Palram 700492

  • Page 1 Replacement parts - contact Customers service helpline at: 129L x 71W x 165H CM For additional information please visit our web site: www.palram.com I MP O R TAN T TOOLS & EQUIPMENT Tape measure...
  • Page 2 C o n t e n t s Qty. mm/inc. Qty. mm/inc. Qty. Item mm/inc. Item Item 1220x610mm/48.03x24” P501 1220x610mm/44.69x24” P502 A701 1190mm/46.85” A702 670mm/26.38” A791 615mm/24.21” 680x612mm/26.77x24.09” P520 P519 650x610mm/25.59x24” A711 1200mm/47.24” A712 200mm/47324” A721 1472mm/57.92” A715 680mm/26.77” A722 1472mm/57.92” 610 mm/19.83x24”...
  • Page 3 Assembly of base profiles: Be sure to bend the profiles into 90 , and to tighten firmly with screws 447. A761 #M747 #M745 #M746 #A761...
  • Page 4 Assembly of the corners profiles A711 & A712: Connect profiles A721,A722 to the base. Pay attention to set the profiles accordind to the detraction shown on the profiles A711 during the assembly of profile A761. NOTE: All nuts 412 should be on the inside of the stretcher,insert the screws 411 from the outside inwards.
  • Page 5 Assembly of profile A754: Assembly of the gutter A731 (The profile also includes the door Be sure to use the lower hall of existing two. track): Be sure to locate the gutter as shown in the illustration. A253 A754 A731 A754 A731 #A754...
  • Page 6 Assembly of profile A715 and A716: Assembly of the A741 profiles: Connect the profiles as shown in the illustration. Connect the profile on both ends to profiles: A715 and A716, and mark the connecting points (to the wall), using the pre-drilled halls in the profile.
  • Page 7 Assembly of profile A702 on the roof: Assembly of profile A701 on the front wall: Connect the proile to profiles A741 on one side , and A731 on the Connect the profile to the profile A731 on one sideand to profile second side.
  • Page 8 Door sub-assembly: Door sub- assembly (continued): Insert rubber seal R303 into profiles A771. It is advisable to use small Lay panel P502. Be sure to insert both ends into the channel in profiles A791. amount of tender appropriate lubrication material. Connect profiles A771 with profiles A791 using screws 421.
  • Page 9 Assembly follows illustration. Connect plastic strips P332 on both sides of panel P502. NOTE: It is imperative to thread in the plastic strips.Onto the aluminum profiles in it’s assigned position. See illustrations A to D. Door sub-assembly (Continued): Connect all four plastic rollers P304 using screws 421 and nuts 422. P332 P332 P304...
  • Page 10 Assembly noise reduction profile P317 to wall panels. Assembly of the door to wall panels: Slid the door unto the track on frofile A731 (gutter), and on the same time on proffile A761. Insert two screws, 411& nuts 412 on both ends of profile A731. A731 P317 P317...
  • Page 11 Lay panel P501. Connect plastic strips P331and P330. See illustations A to D. Be sure to insert upper and into the channel in profile A731 and frofiles A754. P331 P501 P501 P330 P501 #P330 #P501 #P331...
  • Page 12 Apply roof panel P520 and triangle panels P521&P522. Connect Assembly follows illustration. plastic strips P334. See illustrations A to D at step #17. P316 P333 P520 P521 P522 P334 P520 P316 P334 P316 #P521 #P522 #P333 #P316 #P520 #P334...
  • Page 13 Vent sub-assembly: Apply profiles A782,A751,A752 and assemble Assembly follows illustration. according to the illustration using screws and nuts 411, 412. A751 A782 P519 A752 A782 P302 #P519 A307 #A751 #A782 #A752...
  • Page 14 Fasten all screws and nuts of your Lean-To greenhouse. M307 #M307...