ARM (SUCTION)
projection
LEVER (LDG-A) / (LDG-B)
shaft A
1 Fit the lever (LDG-A) on
shafts A – C and install it.
shaft B
shaft C
– 22 –
2 Move the arm (suction) in the arrow
direction and fit on projection.
1 Fit the arm (suction) on the shaft.
shaft D
3 two type-E stop ring 2.0
2 Fit the lever (LDG-B) on
shafts A – E and install it.
shaft E
shaft A
shaft C