SECTION 3
ASSEMBLY OF TAPE MECHANISM
Note : Follow the assembly procedure in the numerical order given.
ALIGNMENT OF ROTARY SWITCH
1 Align Δ mark on the rotary switch
the position shown in the figure.
hole
chassis (S) assy
2 Align hole in the gear (LDG-D) with
the position shown in the figure.
GEAR (LDG-E)
1 Align hole as shown in the figure.
2 Install the gear (LDG-E).
chassis (S) assy
– 18 –