Advertisement

S i t e P r e p a r a t i o n M a n u a l
5869
3.0
Version
M
2 0 0 0
AY

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Premier C Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tokheim Premier C Series

  • Page 1 S i t e P r e p a r a t i o n M a n u a l 5869 Version 2 0 0 0...
  • Page 2 Copyright © 1999 Tokheim Corporation. All rights reserved. The information contained in this manual is copyrighted by Tokheim Corporation and is for the exclusive use of Tokheim’s Authorized Service Representatives, Distributors, and customers, who are authorized to make copies for use in their business. No...
  • Page 3 When the dispensers arrive at the installation site, the unpacked units should be inspected for possible shipping damage. If damage is evident, it must be reported to the carrier. Shipping damage is not covered under the Tokheim warranty policy. After unpacking and prior to installation, the delivered equipment should be inspected to insure that all the required materials are on hand, and the dispensers have all the ordered options and markings.
  • Page 4 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 1.0 July 1999...
  • Page 5: Table Of Contents

    Determining Side A on the Dispenser .......... 2-15 Underground Piping Requirements Underground Piping for Vapor Return Lines (MaxVac) ....2-16 Emergency Shut-off Valves (Impact or Shear Valves) ....2-16 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 6 Sample Main & Sub Panel Wiring Diagram ........3-28 Sample Electrical System Wiring Diagram ........3-30 4 Glossary A — Z ..................4-1 – 4-4 Index ..............Index-1 – Index-2 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 7 • “NO SMOKING” • “WARNING — IT IS UNLAWFUL AND DANGEROUS TO DISPENSE GASOLINE INTO UNAPPROVED CONTAINERS”. TOKHEIM DISPENSERS SHALL NOT BE USED FOR DIRECT FUELING OF AIRCRAFT WITHOUT FILTERS, SEPARATORS, AND OTHER EQUIPMENT NECESSARY TO ENSURE PRODUCT PURITY. Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 1.0 July 1999...
  • Page 8: Safety Information

    Safety Information The following requirements are mandatory and shall be followed when installing, using, or working around Tokheim equipment. These hazards or unsafe practices may result in death or severe injury to persons, or damage to equipment or property. DANGER! FIRE AND EXPLOSION HAZARD...
  • Page 9: Introduction

    (National Fire Protection Agency) requirements before installing the equipment. 30, 30A, 70 and Failure to install the dispensers per Tokheim specifications may void the applicable National, Tokheim Warranty. Express permission must be obtained for alternative State, and Local code wiring schemes.
  • Page 10: Document-On-Demand

    Introduction DOCUMENT-on-DEMAND Tokheim has a FAX-back service that allows its customers to retrieve documents 24-hours-a-day, 7-days-a-week. The documents that are available consist mainly of Dispenser Outline Drawings, Dispenser Foundation Plans, Wiring Diagrams, and other related Technical Information. To access this service, dial (219) 484-1864 and follow the automated instructions to retrieve your document.
  • Page 11: Planning And Preparation

    Determining Side A on the Dispenser ......... 2-15 Underground Piping Requirements Underground Piping for Vapor Return Lines (MaxVac) ....2-16 Emergency Shut-off Valves (Impact or Shear Valves) ....2-16 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 12: H322C-Rb3 & Rb5, H322C-Sb3 & Sb5

    Planning and Preparation Outline Drawing H322C-RB3 & RB5, H322C-SB3 & SB5 741645 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 13: H322C-R, H322C-S

    Planning and Preparation Outline Drawing H322C-R, H322C-S 741644 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 14: H324C-R, H324C-S

    Planning and Preparation Outline Drawing H324C-R, H324C-S 741643 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 15: H422C-R, H422C-Rb3 & Rb5

    Planning and Preparation Outline Drawing H422C-R, H422C-RB3 & RB5 741640 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 1.0 July 1999...
  • Page 16: H412C-R, H424C-R, H424C-Rb3 & Rb4, H424C-Sb3+1

    Planning and Preparation Outline Drawing H412C-R, H424C-R, H424C-RB3 & RB4, H424C-SB3+1 741641A Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 17: H413C-R, H426C-R, H413C-Reb, H426C-Reb, H426C-S

    Planning and Preparation Outline Drawing H413C-R, H426C-R, H413C-REB, H426C-REB, H426C-S 741639 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 18: H414C-R, H428C-R, H428C-Reb, H428C-Seb

    Planning and Preparation Outline Drawing H414C-R, H428C-R, H428C-REB, H428C-SEB 741642A Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 1.0 July 1999...
  • Page 19 Planning and Preparation Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 1.0 July 1999...
  • Page 20 Planning and Preparation Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 2-10 Form 5869 Version 1.0 July 1999...
  • Page 21 Planning and Preparation Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 1.0 July 1999 2-11...
  • Page 22 Planning and Preparation Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 2-12 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 23 Planning and Preparation Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 2-13...
  • Page 24: Moving The Dispenser

    Equipment could fall and cause severe injury or death. Stand clear from the dispenser when lifting and lowering. 1-229690 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 2-14 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 25: Determining Side A On The Dispenser

    Side A. The unleaded product on Tokheim dispensers is not always located on the left as you are looking at side A. Model/Serial plate location Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 2-15...
  • Page 26: Underground Piping Requirements

    Liquid and vapor lines are to be threaded and drawn up tight to the dispenser to maintain a tight seal. Underground Piping for Suction Dispensers For installation of underground piping on Tokheim Suction dispensers, see Form 1680B, The ONE Manual (Care of Your Pumps) for general installation guidelines.
  • Page 27 Protection Agency) are installing before attempting the installation. 30, 30A, 70 and applicable National, Failure to install per Tokheim specifications, or maintenance by untrained State, and Local code personnel, may void the Tokheim Warranty. Express permission must be requirements. obtained from Tokheim for alternative wiring and/or installation schemes.
  • Page 28: General Wiring Requirements

    All field wiring enters the dispenser junction box, which is wire and conduit at located on side B of the hydraulics compartment. this time. See DPT cable specifications later in this section. Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 1.0 July 1999...
  • Page 29: Grounding Requirements

    The bonding rod must be 8 feet long, solid, corrosion- electrical cabling or resistant, and located in close proximity to the dispenser (9 conduit runs. feet minimum). Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 2.0 July 1999 Rev. 03/10/00...
  • Page 30: System Requirements

    System Requirements Stand Alone Installations (no console operation) • A minimum of six (6) inches must be maintained between all Tokheim cabinets and any other enclosures and/or devices to CAUTION: allow free movement of air. Failure to comply with these requirements will result in damage to the •...
  • Page 31: System Power Considerations

    Failure to comply with incoming AC power lines to the service panel be current load balanced. these requirements will All Tokheim equipment is required to be on the same voltage phase from result in damage to the the service. system and is not covered under warranty.
  • Page 32: Remote Dispenser Current Requirements

    Table 3.B Amperage Table for Light and Heater Power Circuits Optional Spandrel Lighting Maximum Amperes @ 120 VAC / 60 Hz. = 15 Amperes Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 2.0 July 1999 Rev. 03/10/00...
  • Page 33 Model H426C = Premier C Dispenser 6 hoses (3 on each side) 2 Sides used 45" Cabinet Model Type Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 1.0 July 1999...
  • Page 34: Suction Dispenser Current Requirements

    380 VAC 3 Dispenser one time 3/4 HP 60 Hz 3/4 HP 50 Hz Table 3.D Amperage Table for 240/380 VAC Suction Dispensers Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 35 Total of Electronics, Light's and Motor Electronics and Light Circuits 5.00 Motor Current 16.80 Total per H426C 21.80 Amperes (x4 dispensers) 87.20 Total System Amperes Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 36: Peripheral Devices Current Requirements

    One (1) 3-conductor cable with drain wire. Communications Cable O.D. = 0.2 inches (cross sectional area = 0.0314 inches) Table 3.F Wire Gauge over Distance Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-10 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 37: Determining Number Of Wires Required

    THHN/THWN Wire Areas Gauge Area (sq. in.) 0.0062 0.0079 0.0087 0.0117 0.0184 0.0373 0.0519 0.0845 0.0995 0.1182 DPT Comm. 0.0314 Table 3.H Conduit Area Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 3-11...
  • Page 38: Determining Conduit Size Required

    1-1/4 1.38 0.45 determining the trade size conduit needed. 1-1/2 1.61 2.04 0.82 0.612 2.067 3.36 1.34 1.01 Table 3.I Wire Area Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-12 Form 5869 Version 2.0 July 1999 Rev. 03/10/00...
  • Page 39: Electrical Conduit Requirements

    Remote Control Only • Use one conduit per dispenser for all Tokheim field wires. Do not daisy chain dispenser conduit runs. Exception: If an intercom system is used, two conduits must be used. See “Intercom Systems” below.
  • Page 40: Tokheim Debit System (Tds)

    Stranded, tinned copper, 20 AWG or braided shield VOLTAGE RATING: Cable must be rated at 600 V when all Tokheim field wires are installed in one conduit. A rating of 150V is acceptable when the cable is installed in a separate conduit.
  • Page 41 Typical Installation & Wiring Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 3-15...
  • Page 42 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-16 Form 5869 Version 2.0 July 1999 Rev. 03/10/00...
  • Page 43 Typical Installation & Wiring Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 3-17...
  • Page 44 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-18 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 45 Typical Installation & Wiring Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 3-19...
  • Page 46 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-20 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 47 Typical Installation & Wiring Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 3-21...
  • Page 48 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-22 Form 5869 Version 3.0 May 2000...
  • Page 49 Typical Installation & Wiring Premier C Suction Dispenser Motor / Junction Box Wiring Schematic - 120 VAC, 50/60 HZ Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 3-23...
  • Page 50 Typical Installation & Wiring Premier C Suction Dispenser Motor / Junction Box Wiring Schematic - 240 VAC, 50/60 HZ Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-24 Form 5869 Version 3.0 May 2000...
  • Page 51 Typical Installation & Wiring Premier C Suction Dispenser Motor / Junction Box Wiring Schematic - 380/220 VAC, 3 Phase Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 3-25...
  • Page 52 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-26 Form 5869 Version 3.0 May 2000...
  • Page 53 Typical Installation & Wiring Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 3-27...
  • Page 54: Sample Main & Sub Panel Wiring Diagram

    Typical Installation & Wiring Sample Main & Sub Panel Wiring Diagram NOTE: L2 is only used in 220VAC applications Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-28 Form 5869 Version 3.0 May 2000...
  • Page 55 Typical Installation & Wiring Sample Main & Sub Panel Wiring Diagram (continued) Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 3-29...
  • Page 56: Sample Electrical System Wiring Diagram

    Typical Installation & Wiring Sample Electrical System Wiring Diagram Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-30 Form 5869 Version 3.0 May 2000...
  • Page 57: Premier C Series Dispensers Site Preparation Manual Tokheim Corporation

    Typical Installation & Wiring Sample Electrical System Wiring Diagram (continued) Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 May 2000 3-31...
  • Page 58 Typical Installation & Wiring Tokheim Corporation Premier C Series Dispensers Site Preparation Manual 3-32 Form 5869 Version 3.0 May 2000...
  • Page 59: Glossary

    BLENDED PRODUCT Product composed of a percentage (blend ratio) of two grades of fuel. BLENDER DISPENSER Premier C series dispensers that allows the mixing of two grades of fuel to create a mid-range grade. CB(n) Circuit breaker (n). Device used for over-current protection.
  • Page 60 Hertz, a unit of measure for frequency (cycles per second). INSIGHT ™ A model of Tokheim Dispenser Payment Terminal that includes a graphic display and a standard or graphic printer. AC Hot in a 240 VAC system, 120 VAC above ground potential, 90 degrees out of phase from L2.
  • Page 61 Tokheim Encryption Device (TED). TDS Plus Tokheim Debit System Plus - the name for the original debit system provided by Tokheim that incorporates a secure pin pad at the dispenser. Tokheim Encryption Device – used with Tokheim Debit System (TDS) to provide secure debit transactions.
  • Page 62: Form 5869 Version 3.0 July 1999 Rev

    Programming for transverse operation is performed in Modes F23 and F29. U.L. Underwriter’s Laboratories. VAC, AC AC Voltage, Alternating Current DC Voltage, Direct Current Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 63 Motor Current Requirements 3-8 Moving the Dispenser 2-14 Electrical conduit requirements 3-13 system wiring diagram 3-30, 3-31 Electromagnetic Interference 3-13 Electronics & Light Circuits 3-7 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 Index-1...
  • Page 64 3-3 without hose controller 3-17 conduit 3-11, 3-12, 3-13 Underground Piping for Suction Dispensers 2-16 control relay 3-4 System Requirements 3-4 Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Index-2 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 65 Wiring Schematic Suction Dispenser Motor / Junction Box 120 VAC, 50/60 HZ 3-23 240 VAC, 50/60 HZ 3-24 380/220 VAC, 3 PHASE 3-25 Premier C Series Dispensers Site Preparation Manual Tokheim Corporation Form 5869 Version 3.0 July 1999 Rev. 05/12/00 Index-3...
  • Page 66 Index Tokheim Corporation Premier C Series Dispensers Site Preparation Manual Index-4 Form 5869 Version 3.0 July 1999 Rev. 05/12/00...
  • Page 67 ___________________________________________________________________ Page#: Error: _____ ___________________________________________________________________ Page#: Error: Suggestions for Improvements or Additional Comments: ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Date: ______________________________________ Name: _____________________________________ Please send to: Title: _____________________________________ Technical Publications Company: __________________________________ Tokheim Corporation PO Box 360 Fort Wayne, IN 46897-1028...
  • Page 68 FOLD HERE NO POSTAGE NECESSARY IF MAILED IN THE UNITED STATES BUSINESS REPLY MAIL FIRST CLASS PERMIT NO 41 FORT WAYNE IN POSTAGE WILL BE PAID BY ADDRESSEE TECHNICAL PUBLICATIONS TOKHEIM CORPORATION PO BOX 360 FORT WAYNE IN 46897-1028 FOLD HERE...
  • Page 70 For technical questions, please contact: Tokheim Solution Center Ph: 800-866-6762 Fax: 219-470-4644 For service parts, please contact: Service Parts Department Ph: 219-470-4710 Fax: 800-866-1999 TOKHEIM CORPORATION PO BOX 360 FORT WAYNE IN 46801...

Table of Contents

Save PDF