Download Print this page
Haas Mini Mill Operator's Addendum

Haas Mini Mill Operator's Addendum

Advertisement

Quick Links

Mini
Mini
Mill
Mill
Operator s
Operator s
Operator s
Operator s
Addendum
Addendum
Addendum
ES0205l
12-00
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Mini Mill and is the answer not in the manual?

Questions and answers

Summary of Contents for Haas Mini Mill

  • Page 1 Operator s Operator s Operator s Operator s Mini Addendum Mini Addendum Addendum Mill Mill ES0205l 12-00...
  • Page 2 Warranty Certificate Covering Haas Automation, Inc., CNC Equipment LIMITED WARRANTY COVERAGE LIMITS and EXCLUSIONS NOTE: Haas Automation, Inc. 2800 Sturgis Road Oxnard, CA 93030-8933 Phone: (805) 278-1800 FAX: (805) 278-8561 ES0205l 12-00...
  • Page 3 Haas Automation. To unlock the machine, we must have the above registration with the serial number and the authorization from your dealer. You will receive a number from Haas that you will write in over the serial number on setting page (#26).
  • Page 4 IMENSIONS OOTPRINT 60.00 (152.40 cm) 23.00 (58.42 cm) 54.00 (137.16 cm) 80.09 50.00 (203.43 cm) (127.00 cm) 31.00 (78.74 cm) 68.14 (173.08 cm) ES0205l 12-00...
  • Page 5 PECIFICATIONS Table Travels: Table: T-Slots: Spindle Nose To Table: Overtravel: T-Slots, optional Metric Table: Spindle Spindle: Spindle Motor Rating: General Feed Rates: Tool Changer: Air Required: Coolant Capacity: Power Required: Weight: ES0205l 12-00...
  • Page 6 BEAM STYLE LIFTING MINI MILL * Spreader bars and spacer blocks are not provided. 36” 3400 lbs. Rigging Beam 24” Spreader Bar 20” Spreader Bar Watch this area ES0205l 12-00...
  • Page 7 HIPPING RACKET NOTE: Remove and discard the shipping bracket, located on the top right of the Mini Mill door. Shipping Bracket Door SHCS (4) ES0205l 12-00...
  • Page 8 LECTRICITY EQUIREMENTS IMPORTANT! REFER TO LOCAL CODE REQUIREMENTS BEFORE WIRING MACHINES. ALL MACHINES REQUIRE: Mini Mill WARNING! ES0205l 12-00...
  • Page 9 Connecting the Mini Mill to Power Ground Line T5 Transformer Main Circuit Breaker NOTE: For Single Phase operation, only terminals L1 and L3 of the circuit breaker are used. L2, the center connection, should be left open. CAUTION! Make sure that the main circuit breaker is in the OFF position BEFORE changing the following transformer connections.
  • Page 10 LECTRICAL PERATION Fault Display ES0205l 12-00...
  • Page 11 NOTE: These Installation Recommendations are to be used in conjunction with those in the Operator’s Manual. Material supplied here is given specifically for the Mini Mill. Machine Coolant • • Levelling The Mini Mill needs only to be rough-levelled AINTENANCE Spindle PTIONS Floppy Drive BT Tooling 4th-Axis...