Download Print this page

Assembly; Unpacking - PowerTec UT1002 Owner's Manual

Universal stand

Advertisement

2

UNPACKING

Refer to Figure 2
Your new universal stand is shipped complete in one
carton.
the carrier immediately.
2
carton and make sure all parts are accounted for.
ITEM DESCRIPTION
A
Short upper cross brace
B
Shelf (two pieces)
C
Short lower cross brace
Long lower cross brace
Long upper cross brace
F
Leg
G
Feet
H
Table top (two pieces)
Pan head wood screw (table top)
J
Washer (table top)
Pan head screw (frame assembly)
L
Nut (frame assembly)
M
Pad (adjustable foot)
N
Countersink screw (adjustable foot)
O
Nut (adjustable foot)
P
Washer (adjustable foot)
Figure 2
A
C
G
J (12)
B
F
H
N(1)
O (2)
L (24)
M (1)

ASSEMBLY

ASSEMBLY
Refer to Figure 3 - 5
WARNING
ladder. Make sure to tighten all screws securely prior to
use. Maximum capacity is 500 lbs (227 kg).
NOTE: Use pan head screws and nuts to assembly all
components except the tabletop and leveling device.
NOTE:
QTY
completely assembled. Always insert bolts from outside.
2
pan head screws and nuts.
2
2
2
Make sure the long lower cross brace is positioned so
2
the flange creates a ledge for the shelf.
4
4
top braces.
2
Figure 3
10
12
24
Nut
24
1
INSIDE
1
2
1
Short Lower
Cross Brace
braces using carriage bolts and nuts. Make sure the
short upper cross braces overlap the long upper cross
braces as shown Figure 3 inset and the short lower
cross braces are positioned so the flange creates a
ledge for the shelf.
P (1)
universal stand for scaffolding or as a
Frame
Bolt
Long Upper
Cross Brace
OUTSIDE
Long Lower
Cross Brace
Nut
Leg
Nut
Screw
Foot
Short Upper
Cross Brace
Ledge
Flat Washer
Foot
Pad

Hide quick links:

Advertisement

loading