System Installation; Checking Before Installation - Huawei SUN2000-42KTL User Manual

Hide thumbs Also See for SUN2000-42KTL:
Table of Contents

Advertisement

SUN2000-(36KTL,42KTL)
User Manual

4.1 Checking Before Installation

Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter model is not
what you require, do not unpack the package but contact the dealer as soon as possible.
Figure 4-1 Position of the inverter model label
(1) Position of the model label
Deliverables
After unpacking the inverter, check that the deliverables are intact and complete. If any
damage is found or any component is missing, contact the dealer.
Issue Draft A (2016-05-30)
You are advised to remove the packing materials within 24 hours before installing the inverter.
For details about the number of deliverables, see the Packing List in the packing case.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4

System Installation

4 System Installation
16

Advertisement

Table of Contents
loading

Table of Contents