Sharp 37VT-26H Service Manual page 38

Table of Contents

Advertisement

37VT-26H(GY)
23. INSTALLING THE SHIFTER
Capstan
D.D. motor
Reel pulley
(Bottom side of mechanism chassis)
Figure 1-42.
Insert
point 3
Insert
point 2
Phase-matching
point 1
1. Make sure that the loading gear is at the phase-
matching point 1 as shown below.
2. Install, paying attention to 5 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see
Drum
the phase-matching point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Round mark
Sifter
Shaft 1
Rotation
point 2
Shaft 1
Figure 1-43.
38
Phase-Matching
point 2
Loading gear(T)
Insert
point 1
Shaft 1
Half round notch
Insert
point 4
Insert
point 5
Shaft 2
Release
point 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

37vt-26hgy

Table of Contents