INSTALLATION, OPERATION AND MAINTENANCE
• Bionet 12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bionet 12 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ariterm Bionet 12

  • Page 1 INSTALLATION, OPERATION AND MAINTENANCE • Bionet 12...
  • Page 2: Table Of Contents

    Make sure to cut the power supply to the boiler before removing the burner housing. Maintenance contract Ariterm recommends the boiler installation to be made by a company with professio- nal competence. For more information please contact your Ariterm retailer.
  • Page 3: Dimensions / Items Included / Technical Data

    • Installation kit for solar energy powered hot water supplier (part nr 1300-55241C00) • Draught regulator Tigex Ø102 Comb. fl ue pipe Kombinationsrökrör TECHNICAL DATA Bionet 12 1. Shunt outlet DN 25 male Performance Output using pellets 12 kW 2. Return line 3. Flame observation...
  • Page 4: Operating Principle

    OPERATING PRINCIPLE Th e convenience, environmental performance and effi ciency are optimised to meet the demands of ease-of-use and effi cient pellet combustion. Ariterm Bionet has a vertical convection system that reduces deposition, which allows the boiler to retain a high coeffi...
  • Page 5: Installation

    All work on the boiler must be carried out by a qualifi ed electrician. ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 5/12...
  • Page 6: Water Piping

    Boiler cement is suitable for sealing. Recommended fl ue gas requirements for Bionet 12: brick chimney lined with a Ø 100 mm acid proof thin-walled tube or an acid proof Ø 100-120 mm:s element chimney. Recommended underpressure in In the following table, you will fi...
  • Page 7: Filling Of Water

    (recommended setting = 80°C). Th e temperature on the boiler must never be set so low that condensation forms in the boiler. ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 7/12...
  • Page 8: Maintenance

    ATTENTION! Show a great care when emptying the ash as it might be glowing hot. Ash must be kept in a fi reproof container. ATTENTION! Pay special attention to the pellets quality when you receive a new delivery or when you change supplier. ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 8/12...
  • Page 9: Storage Planning

    Th e pellet store should be designed to eliminate the risk of contamination and moisture penetration. Take special care to avoid damp penetration through the walls and fl oor. It is also important that pellets are not exposed to direct contact with water Store pipe (delivered by Ariterm), 2 x horizontal 80 mm see previous page.
  • Page 10: Installation Protocol

    If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifi cations without prior notice. ARITERM SWEDEN AB...
  • Page 11: Declaration Of Conformity

    DECLARATION OF CONFORMITY NOTES ARITERM SWEDEN AB Installation, Operation and Maintenance - 2007.10.26- 11/12...