Vaventis fresh-r On-The-Wall Installation Manual page 13

Table of Contents

Advertisement

5.
Put EPP glue around the edges of EPP covers of the upper duct pipe and the lower
duct pipe.
NOTICE
The connection of the lower duct pipe and the upper duct pipe to the Unibody needs to be
airtight because air leaks can create unwanted condensation.
Epp glue
fig. 13
Put EPP glue around the edges of the covers
6.
Cut the Epp covers. They need to cover the whole duct pipe.
The lips need to extend beyond the covers.
fig. 14
Cut the EPP covers
fig. 15
The lips need to extend beyond the covers