Battery Installation - ReliOn BP200 Instruction Manual

Hide thumbs Also See for BP200:
Table of Contents

Advertisement

1. Press the hook on the top of the battery cover and lift the
cover off in the direction of the arrow.
2. Install 4 "AA" size batteries so the + (positive) and
- (negative) polarities match the polarities of
the battery compartment as indicated.
3. Replace the battery cover.
NOTES: • When the depleted battery symbol (
monitor off, then replace all batteries at the same time. Long life alkaline
batteries are recommended.
• Turn the unit off before replacing the batteries. If the batteries are removed
while the unit is still on, the date and time will be reset to that of the
previous use. The measurement values are not deleted.
• When the batteries are replaced, you may need to reset the date and time.
If "-:--" appears on the display, refer to "Setting the Date and Time".
• The batteries included with the device may have a shorter life.

BATTERY INSTALLATION

Battery Cover
) appears on the display, turn the
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hem-741creln4

Table of Contents