Vaillant geoTHERM Installation Instructions Manual page 64

Table of Contents

Advertisement

7
Electrical installation
7.29 Connecting the eBUS line for the operating panel
> If you are not using the vrnetDIALOG accessory, connect
the supply line to the operating panel..
7.30 Fitting the cover column for the operating panel
> Push the cover column for the operating panel into the
clip holder on the mounting plate for the operating
panel.
64
3.
2.
7.31 Installing the upper cladding section
> Place the front upper cladding on the heat pump
and use two screws to secure this.
> Push the rear upper cladding for the pipe feed into the
clip holder.
Installation instructions geoTHERM 0020051574_04
2.
1.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents