Shutdown / switching off

Menu item
Type collector array 1
Question
What type of collectors are
installed in the collector
array?
Gross collector area 2
Question
How large is the gross
collector area?
Type collector array 2
Question
What type of collectors are
installed in the collector
array?
Climate zone
Question
Which value corresponds to
the climate zone where the
solar system is installed?
Start solar thermal system
Question
Is the solar system filled and
vented? Do you want to
start the solar system now?
Table 6
Settings in the Commissioning menu
5.4

Additional settings at commissioning

Some settings are only available if the system is designed and
configured accordingly. For more details refer to the MS 100/
MS 200 technical documentation.
▶ Check the settings in the service menu ( Chapter 7,
page 10 and installation instructions MS 100/MS 200).
5.5

Performing function tests

The function tests can be accessed via the diagnosis menu. The
available menu items are strongly dependent on the system
installed. Under this menu the following can be tested, for
example: Solar pump: On/Off ( Chapter 7.2.1, page 12).
5.6

Check monitored values

The monitored values can be accessed via the Diagnosis menu
( Chapter 7.2.2, page 12).
10
Answer / setting
Flat-plate collector |
Vacuum tube collector
Answer / setting
2
0 to 500 m
Answer / setting
Flat-plate collector |
Vacuum tube collector
Answer / setting
Search the location of the
solar system in the climate
zone map ( Solar module
installation instructions)
and enter the value of the
climate zone.1...90...255
(90 is default figure)
Answer / setting
Yes | No
5.7

System handover

▶ Enter the contact details of the responsible installer in the
Diagnosis menu > Maintenance > Contact address, e.g.
company name, phone number and address or e-mail
address ( Chapter 7.2.5, page 12).
▶ Explain to the customer how the solar controller and the
accessories work and how to operate them in accordance
with best practice.
▶ Inform the customer about the selected settings.
We recommend to hand over these installation instructions to
the end user.
6
Shutdown / switching off
The solar controller is powered via the BUS interface and is
always switched on. The system should only be switched off for
maintenance work, for example.
▶ Disconnect power from the entire system and all BUS
nodes.
After a prolonged power failure or extended period of idleness,
the date and time may need to be reset. All other settings are
retained permanently.
7

Service menu

The menu of the solar controller is adapted to your system
automatically. Some menu items are only available if the system
has been set up accordingly and the solar controller has been
set correctly. The menu items are only displayed in systems in
which the corresponding system components are installed,
e.g. two collector arrays. The corresponding menu items and
settings can be found in the respective operating instructions.
Information about the operation of the service menu are
summarised in Chapter 4, starting on page 7.
Menu: Service menu
Commissioning
– Start configuration wizard?