D7) Bilge Pumping - Fountaine Pajot Saba 50 User Manual

Table of Contents

Advertisement

D7) Bilge pumping

:
Manual bilge pump ( in cockpit locker)
Open and unfold the manual pump on the aft port front panel
in the aft bench. A pipe stored inside the locker must unrolled
to drain the desired zones.
Electric bilge pumping
The craft is fitted with 6 electric bilge pumps :
1 per engine compartment,
2 per hull.
Push in the switch on the electrical panel: 2 positions possible
1) AUTO position (optional):
The bilge pump is triggered automatically if any water gets
in and its operation is indicated by an alarm.
1) MANUAL position:
The bilge pump is triggered manually by activating
the switch on the electrical panel.
Set the switch back to OFF position when drainage is
complete.
DAD_MDP_055_001 — 15/05/2016
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents