Insertion of turbulators and fitting the boiler door
3.
4.
M 16
*1
In the delivered condition, the boiler door opens to the l.h. side.
Reposition the hinge and catch components, if necessary.
A Only for 320 to 860 kW:
Insert the respective number of turbulators into each hot gas channel of
the third flue (see table); in doing so, push the first turbulator element
approx. h into the hot gas channel, hook in the second or third element
and push in.
Rated output
Turbulator elements
per hot gas flue
Turbulator elements
per boiler
16
*1
2.
A
kW
320 to 440
500 and 560
3
12
1.
630 to 860
2
1
8
4