Dell Networking S5000 Getting Started Manual page 19

Hide thumbs Also See for Networking S5000:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Figure 10. Front Rack Installation
1. Screws
2. 4–Post Rack or Cabinet
3. Mounting Bracket
Rack Grounding
When you prepare your equipment rack, ensure that the rack is earth ground. You must
ground the equipment rack to the same ground point the power service uses in your
area. The ground path must be permanent.
Important Points to Remember for Installing an Ethernet Module
Installing and swapping of Ethernet modules must be done BEFORE power up. If
you need to install or replace a module, power down the system before you
install or replace it. If you install or replace a module when the system is
powered up, the system does not recognize the module. Online insertion of
modules can result in a catastrophic failure.
17

Advertisement

Table of Contents
loading

Table of Contents