Grundfos' warranty. 5.2 Basic requirements Grundfos will not be liable for damage or wear to 5.3 Pump location and positioning products caused by abnormal operating conditions, 5.4 Adjustment of float switch accident, abuse, misuse, unauthorized alteration or 5.5 Non-return check valve...
4. Electrical connection 5. Installation The electrical connection should be carried out in 5.1 Pipe connection accordance with local regulations and following the National Electrical Code. The pump should be Steel or rigid plastic pipe can be screwed directly into grounded.
6. Operation The dismantling of the pump is carried out as follows: 6.1 Starting 1. Disconnect the electricity supply. 2. Allow the pump to drain. Before starting the pump, check: 3. Carefully loosen the suction strainer by inserting • whether the pump is submerged in liquid. a screwdriver in the recess between the outer During normal operation, the strainer of the pump casing and the strainer and pressing it hard.
3. Clean and flush the pump with water to remove 7.2 Replacement of parts possible impurities between the motor and the The impeller assembly and electric cord can be outer casing. Clean the impeller, see fig. 9. replaced. The part numbers and the components included in the service kits will appear from the tables below and fig.
This product or parts of it must be disposed of in an environmentally sound way: 1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. Subject to alterations.
Need help?
Do you have a question about the Unilift KP 150 and is the answer not in the manual?
Questions and answers