Installing The Switch - Cisco Edge 300 Series Installation Manual

Hide thumbs Also See for Edge 300 Series:
Table of Contents

Advertisement

Installing the Switch

Table 2
LED
Ethernet
downlink
Gigabit
Ethernet
WiFi
Bluetooth
Power
Installing the Switch
You can install the switch on a wall by using the wall-mount bracket or install the switch on a desk or
table by using the desktop bracket. You can also install the switch in a ventilated cabinet using the
wall-mount or desktop bracket.
Equipment That You Need
Cisco Edge 300 Series Switch Installation Guide
6
LEDs
Color
Off
Green
Blinking green
Amber
Blinking amber Activity. Port is sending or receiving data at 10 Mb/s.
Off
Green
Blinking green
Off
Green
Blinking green
Off
Green
Off
Green
Blinking green
Blinking amber System software download has failed.
Phillips screwdriver
Scratch awl or other sharp pointed object (wall-mount)
Electric drill with a 6-mm drill bit (wall-mount)
Meaning
No link.
Link present, no activity. Port is operating at 100 Mb/s.
Activity. Port is sending or receiving data at 100 Mb/s.
Link present, no activity. Port is operating at 10 Mb/s.
No link.
Link up.
Activity.
WiFi is disabled.
WiFi is enabled and functioning.
WiFi is transmitting data.
Bluetooth is disabled.
Bluetooth is enabled and functioning.
There is no power or the self test has failed.
System is operating normally.
System software is being upgraded.
OL-24909-02

Advertisement

Table of Contents
loading

Table of Contents