General Commercial Pre-Installation Check List - Pentair Fleck 2850 Service Manual

Hide thumbs Also See for Fleck 2850:
Table of Contents

Advertisement

General Commercial Pre-Installation Check List

WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate
effectively.
ELECTRICAL FACILITIES: A continuous 115 volt, 60 Hertz current supply is required. Make certain the current
supply is always hot and cannot be turned off with another switch.
EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is
built up heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit
should be installed ahead of the water softener.
LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.
BY-PASS VALVES: Always provide for the installation of a by-pass valve.
CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 100° F, and the unit
cannot be subjected to freezing conditions.
Installation Instructions
1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.
(Maximum 4 feet apart for twin units)
2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should
be the same size as the drain line flow control connection. Water meters are to be installed on soft water
outlets. Twin units with 1 meter shall be installed on common soft water outlet of units.
3. Solder joints near the drain must be done prior to connecting the Drain Line Flow Control fitting. Leave at
least 6" between the DLFC and solder joints when soldering when the pipes are connected on the DLFC.
Failure to do this could cause interior damage to the DLFC.
4. Teflon tape is the only sealant to be used on the drain fitting. The drain from twin units may be run through a
common line.
5. Make sure that the floor is clean beneath the salt storage tank and that it is level.
6
Place approximately 1" of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit
at this time.
7. Place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let run a few
minutes or until the system is free from foreign material (usually solder) that may have resulted from the
installation.
8. Place the by-pass in service position.
9. Manually index the softener control into "service" position and let water flow into the mineral tank. When water
flow stops, close inlet valve, place control in "backwash" position to relieve head of air, then gradually open
inlet valve to purge remaining air in tank. Return control to service position.
10. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if
applicable. Plug into power supply.
Page 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents