Phase Sequence Detection - HP 850F Operating Manual

Digital power clamp meter
Table of Contents

Advertisement

Warning
1) To avoid damages to the meter or harms to you,do you measure
higher than AC voltage 600(r.m.s )and AC Current 1000A (r.m.s)
2)
No signal excluding the measurement of power, signal input,
needs to wait for a maximum time of 10 S start time.
3) The data is not saved after power off, After reboot re-count
J Phase sequence detection
(1)Turn on Rotary Switch to select "RST ",(figure 30)
Put Red test lead into " V A" hole, put blue test lead into " V B " ,Put Yellow
figure30
figure 30
28

Advertisement

Table of Contents
loading

Table of Contents