Section 15: Gas Piping; Gas Manifolds; Gas Piping And Pressures; Gas Manifold Venting - Weather-Rite XT112 Installation, Operation & Service Manual

Xt-series direct, gas-fired, industrial air handler
Table of Contents

Advertisement

S
XT I
, O
ERIES
NSTALLATION
PERATION AND

SECTION 15: GAS PIPING

WARNING
Explosion Hazard
Leak test all components of gas piping
before operation.
Gas can leak if piping is not installed
properly.
Do not high pressure test gas piping with air
handler connected.
Failure to follow these instructions can result
in death, injury or property damage.

15.1 Gas Manifolds

All gas piping to the air handler must comply with:
United States: Refer to NFPA 54/ANSI Z223.1 - latest
revision, National Fuel Gas Code.
Canada: Refer to CSA B149.1 - latest revision,
Natural Gas and Propane Installation Code.
The air handlers are available with three gas manifold
options.
• American National Standards Institute (ANSI)
compliant manifold: (See Page 37 , Figure 18 for
XT-112. See Page 37 , Figure 19 for XT-115 - XT-
130.
• Factory Mutual (FM)-compliant manifold:
(See Page 37 , Figure 18 for XT-112. See Page 38,
Figure 20 for XT-115 - XT-130.
• XL compliant manifold: (See Page 37 , Figure 18
for XT-112. See Page 38, Figure 21 for XT-115 -
XT-130.

15.2 Gas Piping and Pressures

The air handler is equipped with a gas manifold
suitable for connection to supply pressure of up to:
• 14 in wc maximum (34.9 mbar) (Model XT-112)
• 5 p.s.i. maximum (XT-115 - XT-130 with FM or XL
compliant manifold).
When gas supply exceeds the above-listed maximum
gas pressures, an additional high pressure gas
36
S
M
ERVICE
ANUAL
regulator will be required to assure that the correct
gas pressure is supplied to the regulator. Pressure
should be measured between the high pressure gas
regulator and safety shut off valve. Minimum gas
pressure as indicated on data plate must be
measured with the burner operating in high fire.
Table 7: Gas Manifold Size
Model
XT-112
XT-115
Gas NPT
¾"
1"
Connection

15.3 Gas Manifold Venting

Vent valves fitted on XL compliant manifolds must be
piped to the atmosphere outside the structure and in
accordance with applicable codes. This is the
responsibility of the installer.
15.3.1 Main Gas Regulator Venting
The main regulator used on 1¼" and larger manifolds
must be piped to the atmosphere outside the
structure. This is the responsibility of the installer.
15.3.2 Vent Line Installation
The following may be used as a guideline for
installation, but all applicable codes and regulations
must be followed.
• Natural gas and LPG are toxic and flammable
substances. They must be released where they
will not cause personal injury or property damage.
The end of the vent line must be located where it
is safe to release gas.
• Pipe the vent line outside the structure.
• Use as short a vertical run of pipe as possible.
• Do not run pipe from a high point to a lower point
to avoid obstacles.
• Use a minimum number of bends.
• Do not downsize the pipe from the origination
point (must be same size or larger).
• Make sure vent line is free from obstructions.
• Do not group lines together into a common
header.
• The outside termination must have a
weatherproof cap or be directed downward for
protection from the elements and must be
screened to prevent the entry of any objects.
XT-118
XT-125
XT-130
1¼"
1½"
2"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xt115Xt118Xt125Xt130

Table of Contents