Section 11: Inlet Hood; Inlet Hood Assembly - Weather-Rite XT112 Installation, Operation & Service Manual

Xt-series direct, gas-fired, industrial air handler
Table of Contents

Advertisement

SECTION 11: INLET HOOD

Crush Hazard
Use proper lifting
equipment and
practices.
Failure to follow these instructions can result in death, injury or property damage.
Inlet hoods are shipped unassembled and must be assembled prior to installation. The inlet hood may be
installed either onto the inlet of the air handler or to an outside wall. After installing an inlet hood, all hardware
must be torqued according to recommended specifications on Page 6, Table 1. In addition, all seams must
be caulked (provided by others).
NOTE: Check to be sure that all required components are present. If any are missing, contact your
WEATHER-RITE
independent distributor.

11.1 Inlet Hood Assembly

FIGURE 12: Inlet Hood with Filter Racks
Top
Right
WARNING
Falling Hazard
Use proper safety
equipment and prac-
tices to avoid falling.
Top Roof
Bottom
Roof
Bottom
Right
Filter Rail
X8
Severe Injury Hazard
Use proper lifting
practices and equip-
ment.
Equipment and
accessories are
heavy.
Top Rain Gutter X2
Bottom
Bottom Rain
Gutter X2
SECTION 11: I
NLET
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and
service.
Edges are sharp.
Top Left
Bottom Left
H
OOD
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xt115Xt118Xt125Xt130

Table of Contents