Ventilation Information - Worcester GREENSTAR HEATSLAVE12/18 User Instructions

Floor standing oil fired condensing combination boiler conventional flue & room sealed flue
Table of Contents

Advertisement

8 716 106 253f
30/3/10

VENTILATION INFORMATION

BOILER LOCATION:
**The boiler can be installed under a worktop as long as:
The worktop above the boiler is easily removable for maintenance.
There is at least 10mm clearance above the boiler.
The front of the boiler is not enclosed.
VENTILATION:
Air vents must be functional at all times and the air supply must not be restricted or contaminated.
The boiler clearances must meet the minimum shown below for servicing and venting purposes.
* If this clearance is less than 75mm the flue 'knock-out' panel sections must be removed to improve air
circulation and cooling.
Do not place clothes or objects to hinder the air circulation required by the boiler.
12
VENTILATION INFORMATION
12:59
Page 14
SERVICE CLEARANCES
1200mm
300mm**
5mm*
600mm
GREENSTAR HEATSLAVE 12/18 - 18/25 - 25/32
530mm
5mm*
8 716 106 253f (03.2010)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar heatslave 18/25Greenstar heatslave 25/32

Table of Contents