5.2.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipments, material as bellow:
5) Press-fixture
6) working table
7) Screw-driver
8) knife*1
5) glove
6) cleaning cloth
7) ESD protection
ite
picture
m
1
2
3
4
Operation
Put panel on the
cushion carefully,
Fetch I/F board and
LVDS FFC ,insert FFC
into I/F .
Fetch power board and
put it into BKT, and put
the connector wire into
I/F connector ,then put
I/F into BKT (like the
pic. Showed )
Lock PCBA screw .--
five or six PCBA
screw ,one earth
screw .
- 43 -
Tool
Notes
Screw driver :
7±1kg