5.2.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipments, materials as bellow:
1) Press-fixture
2) working table
3) Screw-driver
4) knife*1
5) glove
6) cleaning cloth
7) ESD protection
ite
picture
m
1
2
3
Operation
Put panel on the
cushion carefully,
Fetch I/F board and
LVDS FFC ,insert FFC
into I/F .
Fetch power board and
put it into BKT, and put
the connector wire into
I/F connector ,then put
I/F into BKT (like the
pic. Showed )
- 45 -
Tool
Notes