Base Loading; Base Tension; Arm Assembly Idler Jog - Sanyo VHR-M262EV Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY

Base Tension

(Fig. A-9-2)
(A)
31. Base Loading (Fig. A-9-1)
1) Remove the Screw(S7).
2) Lift the Base Loading up.
32. Base Tension (Fig. A-9-2)
1) Breakaway the (A) portion of the Base Tension from the
Embossing of the Chassis.
2) Turn the Base Tension to counterclockwise direction and
lift it up.
4-11
(S7)

Base Loading

(Fig. A-9-1)
(B)
(D)
Fig. A-9

Arm Assembly Idler Jog

(C)
Chassis
33. Arm assembly Idler Jog(Fig. A-9-3)
1) Make narrower the two parts, (A) and (B), as Fig. A-9-3.
2) Lift the Arm assembly Idler up.
NOTE
When disassembling, be careful not to be caught the (D) part
by the Chassis as Fig.
(Fig. A-9-3)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents