Front Panel - LEGRAND 3 109 53 Installation Manual

Maintenance bypass switch
Table of Contents

Advertisement

3.2

Front panel

1.
UPS output power cord: connect to the UPS output sockets
2.
Input Socket: connect to the mains socket
3.
CAM SWITCH: Maintenance Bypass Switch
4.
Lamps: they indicate the presence of the UPS and of the mains
5- 6. Load Sockets: connect to the loads
7.
UPS Input Socket: connect to the UPS Input
8
3 Installation

Advertisement

Table of Contents
loading

Table of Contents