Operations - LEGRAND 3 109 53 Installation Manual

Maintenance bypass switch
Table of Contents

Advertisement

4 Operations

Make sure to switch the operating modes according to the following procedures:
1. UPS MODE  UTILITY MODE (Maintenance bypass)
Step 1: Make sure the orange lamp of the MTBS is lit. If not, refer to the troubleshooting section.
Step 2: Rotate the CAM Switch (Maintenance Bypass Switch) from "UPS" position to "UTILITY"
position. At this stage the loads connected are supplied directly by the mains.
Step 3: Turn off the UPS.
Step 4: Remove the connection between the UPS and the MTBS.
Step 5: The maintenance or replacement of the UPS may now proceed.
2. UTILITY MODE (Maintenance bypass)  UPS MODE
Step 1: Connect the input and output of the UPS to the MTBS, then turn on the UPS following
the instructions of its user manual.
Step 2: Make sure that the green lamp of the MTBS is lit. If not, refer to the troubleshooting section.
Step 3: Rotate the CAM Switch (Maintenance Bypass Switch) from "UTILITY" position to "UPS"
position. At this stage the loads connected are supplied by the UPS.
3 109 53 Maintenance Bypass Switch
17

Advertisement

Table of Contents
loading

Table of Contents