BD -125WP Owner's Manual And Operating Instructions page 16

Table of Contents

Advertisement

BD-125WP
SETUP
(D)
(E)
Verify the Cooling Flow Control
Connect Cooling Supply Line to
Valve is closed.
a water supply.
Pad Installation for Polishing
NOTE:
1. Choose the correct Polishing Disc for the material to be polished (start with a
50, 120 or 220 coarse grit Pad).
(A)
(B)
Align the Velcro Polish-
Verify the Polishing Disc is
ing Disc to the Backer Pad.
centered on the Backer Pad
Press disc evenly and firmly
and the Cooling Ports are
onto the Backer Pad.
not covered.
Material Setup
(A)
If necessary, clamp the material
to be polished to a work surface.
16

Advertisement

Table of Contents
loading

Table of Contents