To Assemble The Handle And Crank Assembly - Craftsman 536.887990 Operator's Manual

9 horsepower electric start 29-inch dual stage
Table of Contents

Advertisement

Available languages

Available languages

TO ASSEMBLE
THE HANDLE
AND
CRANK
ASSEMBLY
1. Cut tie holding shift rod to lower
handle and move shifter to the first
forward gear.
2. Cut and discard the plastic tie that
secures the crank assembly.
3. Loosen, but do not remove, the
screws, flatwashers, Iockwashers,
and hex nuts in the upper holes of
the lower handle. See Figure 3.
4. Remove the fasteners and the eye-
bolt from the lower holes of the low-
er handle See Figure 5.
Right Hand Side
/
Of Upper Handle_
Loosen,
but do not
r_move
11/32"
Flatwasher
5/16" Hex N
5/16"Screw
5/16" Split _"
[i [
Lockwasher /
Figure 3
NOTE:
Make sure the cables are
not caught between the upper and
lower handle.
5. Raise the upper handle into operat-
ing position.
NOTE: If the cables have become dis-
connected form the drive levers, rein-
stall the cables as shown in Figure 4.
Lever
"Z" Fitting
_',
6. Install the fasteners that were re-
moved in step 4. DO NOT tighten
until all bolts are in place.
Le_ Side Of
U
Eye Bolt
3/8"Nylon
s
Locknut
Flatwasher
Figure 5
7. Attach the crank rod to the universal
joint assembly with the hair pin. See
Figure 6.
8. Tighten nut on eye bolt. Make sure
eye bolt is properly aligned and the
crank can freely rotate.
9. Tighten all handle bolts.
Universal
Crank Rod
Figure 6
Control Cable
Figure 4
F-021005L
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents