Note: Follow the disassembly procedure in the numerical order given.
3-1.
CABINET (UPPER) SECTION-1
Open the CD lid.
3-2.
CABINET (UPPER) SECTION-2
handle
two screws
(+BV tapping (B3))
three screws
(+BV tapping (B3))
CNP391 (5P)
CNP393 (4P)
CN804 (7P)
CNP901 (5P)
Close the CD lid.
Open the handle in the
direction of the arrow.
four screws
(+BV tapping (B3))
screws
(+BV tapping (B3))
CN803 (6P)
CN802 (6P)
Open the cabinet (upper) section.
CFD-RG880CP
Open the cassette lid.
CNP392 (3P)
CN805 (5P)
CN809 (2P)
CN810 (2P)
Close the cassette lid.
cabinet (upper)
section
9