Note: Follow the disassembly procedure in the numerical order given.
3-2. CABINET (UPPER) (1) SECTION
5
Open the CD lid.
3-3. CABINET (UPPER) (2) SECTION
2
4 two screws
(+
6 two screws
(+
BV tapping (B3)
)
qa
handle
Close the CD lid.
two claws
1
BV tapping (B3)
)
9 CNP301 (5P)
8 CNP392 (4P)
7 CNP393 (4P)
1
3
4
CFD-G505
Open the handle in the
direction of the arrow.
2 seven screws
(+
BV tapping (B3)
)
3
Open the cassette lid.
5 CNP804 (2P)
flexible flat cable
6
(27 core) (CNP801)
Close the cassette lid.
0 cabinet (upper) section
7