Test Running; Pump Down - LG LS-H186TNA2 Service Manual

Table of Contents

Advertisement

Test Running

1. Check that all tubing and wiring have been properly
connected.
2. Check that the gas and liquid side service valves are
fully open.
Prepare remote control
1. Remove the battery cover
by pulling it according to the
arrow direction.
2. Insert new batteries making
sure that the (+) and (–) of
battery are installed correctly.
3. Reattach the cover by
pushing it back into position.
NOTICE
• Use 2 AAA(1.5volt) batteries. Do not use recharge-
able batteries.
• Remove the batteries from the remote control if the
system is not going to be used for a long time.
Settlement of outdoor unit
• Anchor the outdoor unit with a bolt and
nut(ø10mm) tightly and horizontally on a concrete
or rigid mount.
• When installing on the wall, roof or rooftop, anchor
the mounting base securely with a nail or wire
assuming the influence of wind and earthquake.
• In the case when the vibration of the unit is con-
veyed to the hose, secure the unit with an anti-
vibration bushing.
Bolt
Evaluation of the performance
Operate unit for 15~20 minutes, then check the system
refrigerant charge:
1. Measure the pressure of the gas side service valve.
2. Measure the temperature of the intake and discharge
of air.
3. Ensure the difference between the intake tempera-
ture and the discharge is more than 8°C(46°F)
(Cooling) or (Heating).
Tubing connection
Discharge air
4. For reference; the gas side pressure of optimum
condition is as below.(Cooling)
Outside ambient
Refrigerant
TEMP.
R-22
35°C (95°F)
R-410A
35°C (95°F)
NOTICE
If the actual pressure is higher than shown, the system
is most likely over-charged, and charge should be
removed. If the actual pressure are lower than shown,
the system is most likely undercharged, and charge
should be added.
The air conditioner is now ready for use.

PUMP DOWN

This is performed when the unit is to be relocated
or the refrigerant circuit is serviced.
Pump Down means collecting all refrigerant in the
outdoor unit without loss in refrigerant gas.
CAUTION:
Be sure to perform Pump Down procedure with the
unit cooling mode.
Pump Down Procedure
1. Connect a low-pressure gauge manifold hose to
the charge port on the gas side service valve.
2. Open the gas side service valve halfway and purge
the air from the manifold hose using the refrigerant
gas.
3. Close the liquid side service valve(all the way in).
4. Turn on the unit's operating switch and start the
cooling operation.
5. When the low-pressure gauge reading becomes 1
to 0.5kg/cm2 G(14.2 to 7.1 P.S.I.G.), fully close the
gas side valve stem and then quickly turn off the
unit. At that time, Pump Down has been completed
and all refrigerant gas will have been collected in
the outdoor unit.
Installation
Intake temperature
Discharge
temperature
The pressure of the gas side
service valve.
4~5kg/cm
2
G(56.8~71.0 P.S.I.G.)
8.5~9.5kg/cm
2
G(120~135 P.S.I.G.)
Service Manual 25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls-h186tgd3Ls-c246tlb3Ls-h246tnb0

Table of Contents