How To Fix Installation Plate; Drill A Hole In The Wall - LG LS-H186TNA2 Service Manual

Table of Contents

Advertisement

Installation

How to Fix Installation Plate

The wall you select should be strong and solid
enough to prevent vibration
1. Mount the installation plate on the wall with four
type A screws. If mounting the unit on a concrete
wall, use anchor bolts.
• Mount the installation plate horizontally by aligning
the centerline using a level.
Installation Plate
Type "A" screw
2. Measure the wall and mark the centerline. It is
also important to use caution concerning the
location of the installation plate-routing of the
wiring to power outlets is through the walls typi-
cally. Drilling the hole through the wall for pip-
ing connections must be done safely.
C
Installation plate
Ø70mm
Left rear piping
CHASSIS
(Grade)
A
SJ
90
SL, SK
45
SQ
75
SR
0
ST
105
Installation plate
Installation plate
C
E
Left rear piping
CHASSIS
(Grade)
A
SM
180
SN
180
14 Room Air Conditioner
A
Ø70mm
Right rear piping
Distance (mm)
B
C
20
80
40
80
12
80
40
20
0
210
A
Right rear piping
Ø70mm
Distance (mm)
B
C
D
115
-
115
115
195
115

Drill a Hole in the Wall

• Drill the piping hole with a ø70mm hole core drill.
Drill the piping hole at either the right or the left
with the hole slightly slanted to the outdoor side.
Indoor
D
20
20
12
40
0
E
50
-
WALL
Outdoor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls-h186tgd3Ls-c246tlb3Ls-h246tnb0

Table of Contents