Necta KIKKO ES6 Installation, Use And Maintenance Manual

Necta KIKKO ES6 Installation, Use And Maintenance Manual

Vending machine
Table of Contents

Advertisement

INSTALLATION, USE AND MAINTENANCE MANUAL
Kikko
Espresso
Instant
UK
English
DOC. NO.
H 184U 02
EDITION 1 2004 - 02

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KIKKO ES6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Necta KIKKO ES6

  • Page 1 INSTALLATION, USE AND MAINTENANCE MANUAL Kikko Espresso Instant English DOC. NO. H 184U 02 EDITION 1 2004 - 02...
  • Page 3 DICHIARAZIONE DI CONFORMITA’ DECLARATION OF CONFORMITY DÉCLARATION DE CONFORMITÉ KONFORMITÄTSERKLÄRUNG DECLARACIÓN DE CONFORMIDAD DECLARAÇÃO DE CONFORMIDADE VERKLARING VAN OVEREENSTEMMING INTYG OM ÖVERENSSTÄMMELSE OVERENSSTEMMELSESERKLÆRING YHDENMUKAISUUSTODISTUS Valbrembo, 03/05/2001 Dichiara che la macchina descritta nella targhetta di identificazione, è conforme alle disposizioni legislative delle direttive: 89/392, 89/336, 73/23 CEE e successive modifiche ed integrazioni.
  • Page 5: Table Of Contents

    ADJUSTING THE COFFEE DOSE PAGE 14 TECHNICIAN MENU PAGE 40 WATER TEMPERATURE CONTROL PAGE 14 OPERATING MODES PAGE 15 WIRING DIAGRAMS PAGE 60 USER INTERFACE PAGE 15 NORMAL OPERATING MODE PAGE 15 © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 6: Introduction

    It also assists in the spare parts management. Product code Serial number Model Frequency Type Operating voltage Current Absorbed power Water mains Boiler data characteristics Fig. 1 © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 7: Positioning The Vending Machine

    Executive, BDV and MDB protocol, as well as for installation of 24 V DC validators. Beside the coin mechanism housing, suitable space is provided for the installation (optional) of the most widely used payment systems. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 8: Power Consumption

    - Overheating protection for: Doser units Coffee unit ratiomotor Coffee release magnets Pump Mixers Coffee grinder motor - Fuse protection for: Electronic card and coin mechanism power sup- ply transformer (primary and secondary windings) © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 9: Changeable Combination Lock

    Installation and the following testing operations must the new combination. be carried out exclusively by personnel who have a specific knowledge of the machine functions from a point of view of electrical safety and health regula- tions. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 10: Loading And Cleaning

    70 dB. The dispensed products should be consumed imme- diately. They should never be preserved and/or packed for later consumption. Any other use is unsuitable and thus potentially dangerous. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 11: Loading Cups

    - remove the powder and the water funnels, the feeders, 7 - Stirrer stacker 8 - Cup release button the powder deposit drawers and the mixer wheels from the mixers (see Fig. 7); © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 12: Cleaning The Sugar Dispenser

    Fig. 8 Every time coffee is refilled, or at least once a week, any powder residue should be removed from the external parts of the coffee unit, particularly from the coffee funnel. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 13: Regeneration Of The Softener Unit

    NECESSARILY the one shown in figure 10 Fig. 10 1 - From the tap 2 - To the drain 3 - Cap 4 - Softener unit © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 14: Installation

    (min. inside diameter of 6 mm) to connect the water supply to the fitting (3/4" gas) of the water inlet solenoid valve (see Fig. 13). © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 15: Connection To The Power Supply

    This fundamental safety requirement must be duly verified, and if in doubt the system must be carefully tested by qualified technicians. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 16: Installing The Payment System

    “Master”, i.e. having control over the second machine, or as “Slave”, i.e. leaving the control to the other - switch the machine on; machine. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 17: Coffee Unit Operation

    - coffee temperature (at the spout) 85-89°C approx.; - instant product temperature (at the spout) 75°C approx.; The machine standard settings assign the same price, expressed in number of basic coins, to all selections. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 18: Adjusting The Brewing Chamber Volume

    The finer the grade of grinding the longer the time neces- The boiler temperature is controlled by the software and sary for dispensing the coffee and vice versa. can be adjusted directly from the menu. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 19: Operating Modes

    “Boiler temperature” Displaying the boiler temperature in degree C. “Test” Complete dispensing Dispensing water only Dispensing powder only Dispensing without accessories Dispensing accessories only “GSM” resetting pre-alarm counters “EVADTS” Connection Fig. 18 © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 20: Statistics

    Press the confirm button “ ”, and the message “Confirm?” starts blinking. Press the confirm button “ ”, the message “Working” is displayed for a few seconds and all statistics are reset. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 21: Technician Menu

    .door LED More sugar .push-buttons More water .mobile spouts Less water .coffee dose More powder .unit rotation Less powder .waste container switch Coffee 2 Extra milk More Jug Less Jug Mokka © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 22: Failures

    No cups When the empty cup stack micro-switch opens, the stack shift motor is activated. If after one full turn of the cup dispenser the micro-switch is not closed the machine locks. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 23: Programming The Parameters

    - U-Key - Sida VALIDATORS When the “Validat. Lines” (line setting) function of the “technician” menu is displayed, the value of the 6 validator coin lines, A to F, can be changed. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 24: Common Functions

    Any credit exceeding the amount programmed with this function will be cashed. X.XXX Press the confirm button “ ”, these values will start blinking and can then be modified as necessary. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 25: Monitor

    To allow the drink to flow completely from the mixer to the cup it is possible, for each selection, to set a delay time after the actual end of dispensing for the signal of “end of dispensing” to the user. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 26: Vending Machine Parameters

    This function is used to set the delay time in stopping the cup column rotation in order to compensate any inertia due to the cup type. MOK-CAP WASH This function is not active in this model. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 27: Display

    The message is stored by pressing button “ ”. number (1=Monday, 2=Tuesday etc.). The same time band cannot include days from different weeks. If time bands are set overlapping, the machine will remain switched on for the shorter period. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 28: Statistics

    When pressing the confirm button “ ” the stored data is sequentially displayed, and namely: 1 - counter by single selection; 2 - counter by time bands; 3 - discount counter; 4 - failure counter; 5 - coin mechanism data. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 29: Test

    To connect the printer, do as follows: - press the confirm print button “ ”, displaying the mes- sage “Confirm?”; - connect the printer before confirming; - press the confirm button “ ” to start printing. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 30: Miscellaneous

    The EVADTS (European Vending Association Data Trans- directly to the modem, i.e. the “master GSM”. fer System) communication protocol has two codes for identifying the machine and for recognising the data trans- fer terminal: 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 31: Maintenance

    - Take the snap ring out of its seat; Check that the handle pin of the ratiomotor is correctly engaged in its seat. - remove the piston from the crosspiece; - remove the filter and the piston seal. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 32: Cleaning The Cup Dispenser

    - line up the notch on the micro-switch actuation gear with the arrow on the snail gear support. - respect the orientation of the snail gears, as indicated in the figure. 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 33: Printed Board Functions And Indicator Lamps

    20 - Transformer fuses 21 - Electronic card and coin mechanism power supply transformer 22 - Permanently live socket 23 - Mains fuses 24 - LED 25 - Boiler control board 26 - Relays © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 34: Boiler Control Board

    - J12 MDB coin mechanism - Coin mechanism setting minidips (SW2) - J13 Expansion for BDV / EXE - RS232 serial port - Wash button - Programming button - C.P.U. board 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 35: Configuration Of The Electronic Boards

    The machine is fitted with Flash EPROMs which can be electronically updated. By means of a special program and suitable system (Personal Computer, Up Keys or similar) the machine management software can be updated without replacing the EPROMs. © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 36: Hydraulic System

    3 - Mechanical filter 9 - Volumetric counter 4 - Air-break 10 - Vibration pump 5 - Coffee beans hopper 11 - Bypass 6 - Brewer unit 12 - Dispensing spouts assembly 02-2004 184 02 © by NECTA VENDING SOLUTIONS SpA...
  • Page 37 5 - Solenoid valve assembly 1 - Water inlet solenoid valve 6 - Boiler 2 - Liquid waste container float 7 - Dispensing spouts assembly 3 - Safety thermostat 4 - Anti-boiling thermostat © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 64: Wiring Diagrams

    COFFEE UNIT MOTOR C.P.U. BOARD GRINDER TRANSFORMER MD1-.. INGREDIENT MOTOR - INSTANT TX..DELAYED FUSE (X=COURRENT) CONNECTOR FOR MDB COIN MECHANI CUP SENSOR INGREDIENT MOTOR - SUGAR COLD UNIT PRINTED BOARD VENT © by NECTA VENDING SOLUTIONS SpA 02-2004 184 02...
  • Page 65 © by NECTA VENDING SOLUTIONS SpA NOTE...
  • Page 66 Sx372 01...
  • Page 67 Kikko instant...
  • Page 68 Sx374 02...
  • Page 69 Kikko espresso...
  • Page 70 Sx373 01...
  • Page 71 Kikko...
  • Page 72 © by NECTA VENDING SOLUTIONS SpA NOTE...
  • Page 73 © by NECTA VENDING SOLUTIONS SpA NOTE...
  • Page 74 © by NECTA VENDING SOLUTIONS SpA NOTE...
  • Page 75 The Manufacturer reserves the right to modify, without prior notice, the characteristics of the equipment described in this publication; and further declines to accept any responsibility for any inaccuracies contained in this publication which can be ascribed to printing and/or transcription errors. All instructions, drawings, tables and information contained in this publication are confidential and can neither be repro- duced completely or in part, nor be transmitted to third parties without the written permit of the Manufacturer, who has the sole ownership.

This manual is also suitable for:

Kikko espresso

Table of Contents

Save PDF