Download Print this page

Technical Data Sheet - Miele PT 8407 EL Installations Plan

Hide thumbs Also See for PT 8407 EL:

Advertisement

Technical datasheet
Tumble dryer:
Heating:
Legend:
Optional extras:
BS
Concrete base
Quality and density of concrete must comply with load.
Concrete base must be firmly secured to floor!
Recommended height
Minimum height
Width min.
Width min.
Machine connections:
Electrical
1. Standard voltage
connection
(convertible)
2. Standard voltage
Electrical connection must comply with national
regulations.
Connection using multi-pole wall socket in compliance
with IEC/EN 60309 and IEC/EN 60947 is recommended
in order to simplify electrical tests.
If machines are hard-wired, a multi-pole mains switch
must be provided on site.
A wall socket or main isolator must be accessible after
installation.
Installation plan: PT 8407 EL
Date: 02.09.2014
Abbreviations in bold type:
Connection required
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
Connection cable to be ordered separately
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
Connection cable to be ordered separately
PT 8407
Electric (EL)
en - US
4"
100 mm
2"
50 mm
35 3/8"
900 mm
47 1/4"
1200 mm
3 AC 208V
60 Hz
67264 BTU/h
19.7 kW
3 x 65 A
4 x AWG 6
4 x 16 mm²
3 AC 220 - 240V
60 Hz
74776 - 83653 BTU/h
21.9 - 24.5 kW
3 x 65 A
4 x AWG 6
4 x 16 mm²
Page: 11

Advertisement

loading