Download Print this page

Miele PT 8807 D (Steam) Installations Plan page 13

Advertisement

Technical datasheet
Tumble dryer:
Heating:
Legend:
Optional extras:
BS
Concrete base
Quality and density of concrete must comply with load.
Concrete base must be firmly secured to floor!
Recommended height
Minimum height
Minimum width
Minimum depth
DAV
Steam
The steam connection valve to regulate the steam supply
connection
must be provided on site.
valve
The following valves can be ordered separately as electric
steam valves or as pneumatic steam valves.
Pneumatic steam valve (PND)
Supply point and pneumatic valve controls must be provided on site.
Machine connections:
Electrical
Voltage
connection
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
(Connection cable to be ordered separately)
Electrical connection must comply with national regulations.
Connection using multi-pole wall socket in compliance with IEC/EN 60309 and IEC/EN 60947 is
recommended in order to simplify electrical tests.
If machines are hard-wired, a multi-pole switch must be provided on site.
A wall socket or isolator must be accessible after installation.
Installation plan: PT 8807 D
Date: 29-Jan-2015
Abbreviations in bold type:
Connection required
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Regulatable steam pressure
Connection gauge
PT 8807
Steam (D)
en - US
4"
100 mm
2"
50 mm
36"
900 mm
48"
1200 mm
0 - 145 psi
0 - 1000 kPa
½"
3 AC 208 V
60 Hz
6487.4 BTU/h
1.9 kW
3 x 10 A
4 x AWG 16
4 x 1.5 mm²
Page: 13

Advertisement

loading