- If the Main-Channel recognizes valid PROFIBUS messages from 1 or more connected devices, the
RX-OK LED of this Channel should be blinking.

5.6 Spur Segments

Connect the spur segments to the connectors of Channel 1 to 5 (
). The second method is to
Fig. 17
place a PROFIBUS standardized plug on the DB9 connector of the specific Channel.
Fig. 17 - PROFIBUS DP spur connectors
Pin layout of the screw terminals:
Pin "A": Green wire
Pin "B": Red wire
Pin "I" or "Ground": Cable shielding
Note: Connecting the cable shielding is not required when the ground clips are used.
Testing
- If the Main-Channel recognizes valid PROFIBUS messages from 1 or more connected devices, the
RX-OK LED should be blinking.
_______________________________________________
Version 2.1.1 – June 2014
Page 34 / 59
ProfiHub-A5B5-Manual-EN
© PROCENTEC 2005-2014 - Copyright - all rights reserved

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profihub b5

Table of Contents