Recirculating; Attach Mounting Plate To Wall; Preparation Of Top Cabinet - GE pvm9179 Installation Instructions Manual

Over the range
Table of Contents

Advertisement

Available languages

Available languages

C

RECIRCULATING

INSTALLATION OVERVIEW
C1. Attach Mounting Plate to Wall
C2. Prepare Top Cabinet
C3. Check Blower Motor Orientation
C4. Adapt Blower for Recirculation
C5. Mount the Microwave Oven
C6. Install Charcoal Filter
ATTACH THE MOUNTING PLATE
C1
TO THE WALL
A
C
Attach the plate to the wall using toggle bolts. At least
one wood screw must be used to attach the plate to
a wall stud. Recommended locations on the mounting
plate are indicated by A, B, C and D.
1
Remove the toggle wings from the bolts.
2
Insert the bolts into the mounting plate through
the holes designated to go into drywall and reattach
the toggle wings to
3 4
To use toggle bolts:
Spacing for
Toggles More Than
Wall Thickness
Toggle Wings
Mounting
Toggle
Plate
Bolt
Wall
Installation Instructions
(Non-Vented Ductless)
B
D
onto each bolt.
Bolt End
3
Place the mounting plate against the wall and insert
the toggle wings into the holes in the wall
to mount the plate.
NOTE: Before tightening toggle bolts and wood screw,
make sure the tabs on the mounting plate touch the
bottom of the cabinet when pushed flush against the
wall and that the plate is properly centered under the
cabinet.
CAUTION
Be careful to avoid pinching fingers
between the back of the mounting plate and the
wall.
4
Tighten all bolts. Pull the plate away from the wall to
help tighten the bolts.
C2.
USE TOP CABINET TEMPLATE FOR

PREPARATION OF TOP CABINET

You need to drill holes for the top support screws and a
hole large enough for the power cord to fit through.
• Read the instructions on the TOP CABINET
TEMPLATE.
• Tape it underneath the top cabinet.
• Drill the holes, following the instructions on the TOP
CABINET TEMPLATE.
CAUTION
Wear safety goggles when drilling
holes in the cabinet bottom.
20

Advertisement

Chapters

Table of Contents
loading

Table of Contents