Mechanical Installation; Mechanical Installation Introduction - GH Solar GHxxxP-36 Series Installation Manual

Solar pv system
Table of Contents

Advertisement

When installers installing the system, abide with all local, regional and national statutory
regulations. Obtain a building permit where necessary.

3. Mechanical Installation

3.1.Mechanical Installation introduction

The PV modules should be mounted in a location where they will receive maximum
sunlight throughout the year.
For detailed information on the best elevation tilt angle for the installation, refer to
standard solar Photovoltaic installation guides or a reputable solar installer or systems
integrator.
The module should not be shaded at any time of the daytime.
The modules are not to be installed with a slope less than 127mm/305mm.
Selecting the proper support frame.
Always observe the instructions and safety precautions included with
the support frames to be used with the modules.
Do not attempt to drill holes in the glass surface of the modules. To do so will void the
warranty.
Do not drill additional mounting holes in the frame of the modules. Doing so will void the
warranty.
The support module mounting structure must be made of durable, corrosion-resistant and
UV-resistant material.
Modules must be securely attached to the mounting structure using all eight mounting
points.

Advertisement

Table of Contents
loading

Table of Contents